Challenge Sumitomo !

Communicate your needs; We’ll engineer a solution

Contact Us

Need any information ?

RSS

Challenge Sumitomo !

Beyond readily available and best-in-class products, Sumitomo Metals has demonstrated its capability to take on the most challenging projects with fit-for-purpose and value-added offers. It all starts with a dedicated engineering approach, listening to your deeper needs, before designing and implementing the adequate tailor-made solution. Here below is a selection of these challenges :

Connection - Integral CRA

The combined development of corrosive environments, slimmer well and more complex completion designs is driving the need for the challenging association of Corrosion Resistant Alloy with high clearance Integral Premium connections.

  • Consider Integral CRA Liner below the packer, that shall withstand corrosive fluid exposure
  • Consider 9 5/8" SM2535-110 Semi-flush for the lower section of your Tubing fitting through 11 3/4" Liner
  • Consider 7 5/8" 13CR/S VAM SLIJ-II tie-back, fitting into 9 5/8", as multilateral dual producer (production in the annular)
  • Consider 5 1/2" SM25CRW-125 Semi-flush tied back - tubing fitting into 7" production casing

+ Ascertain the running and anti-galling performance beforehand with qualified VAM® Premium connection to ensure smooth rig operations
+ Rely on and benefit from SMI global engineering expertise of CRA material and VAM® connections